Empennage (Section 6): July 2009 Archives

Drilling HS forward spar and F810

| | Comments (0) | TrackBacks (0)
RV 002.jpg
RVCorrosion3 001.jpg
This is a tricky operation with the turtle deck inplace. It's a critical component, in an inaccesible place. Plans require great scrutiny to place the holes precisely and squarely through the parts required compliant with the MED. The Red item is the plastic base of one of my clamps! The swarf is just there to add dramatic effect.

About this Archive

This page is a archive of entries in the Empennage (Section 6) category from July 2009.

Empennage (Section 6): February 2007 is the previous archive.

Empennage (Section 6): May 2010 is the next archive.

Find recent content on the main index or look in the archives to find all content.

Powered by Movable Type 4.1