Empennage (Section 6): February 2006 Archives

| | Comments (0) | TrackBacks (0)
dsc01542.jpg




Clecoed the VS Frame to check tolerances and fit etc. This was previously constructed by the original owner.

dsc01518.jpg



Elevators: Right Dimpling

| | Comments (0) | TrackBacks (0)
dsc01508.jpg




The right elevator skin is just a little more rigid than the left skin because it does not have the trim cut out.

To enable me to dimple close to the trailing edge I used the large roll of tissue which I kept pushed against the opp. skin using my left arm. This avoided any dents occurring.

Elevators: Left Elevator preparation

| | Comments (0) | TrackBacks (0)
dsc01472.jpg




Similar procedure to that of the Rudder. Back drilling the stiffner to the Left Elevator skin. This is a time consuming and also mistake prone process if not totally concentrating.



Elevators: Left Elevator preparation

| | Comments (0) | TrackBacks (0)
dsc01469.jpg



About this Archive

This page is a archive of entries in the Empennage (Section 6) category from February 2006.

Empennage (Section 6): November 2005 is the previous archive.

Empennage (Section 6): March 2006 is the next archive.

Find recent content on the main index or look in the archives to find all content.

Powered by Movable Type 4.1