Build to re commence shortly!

| | Comments (0) | TrackBacks (0)

Having waited almost 1 year to receive my finish kit, I ordered it in Dec. 2008 and received it in Nov 2009, I'm now ready to start building again.

The cause of the delay was an internal problem with fabrication and delivery of Vans QB's kits, but as  I had consolidated my shipment to reduce costs, so I had to swallow the delay.

Big Misters  handled everything concerning the importation and I cannot recommend them enough. There were 3 complete QB's 2 other kit's and pieces. Jon Woods of BM managed all the paper work and handled the Duty, VAT, Custom clearances too.

0 TrackBacks

Listed below are links to blogs that reference this entry: Build to re commence shortly!.

TrackBack URL for this entry: http://rv-8a.com/cgi-bin/mt/mt-tb.cgi/458

Leave a comment

About this Entry

This page contains a single entry by Levrie published on April 14, 2010 4:44 PM.

F-804 Rudder cable 8A hole placement stbd side looking fwd. was the previous entry in this blog.

VS Alignment (stbd) is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Powered by Movable Type 4.1