Drilling HS forward spar and F810

| | Comments (0) | TrackBacks (0)
RV 002.jpg
RVCorrosion3 001.jpg
This is a tricky operation with the turtle deck inplace. It's a critical component, in an inaccesible place. Plans require great scrutiny to place the holes precisely and squarely through the parts required compliant with the MED. The Red item is the plastic base of one of my clamps! The swarf is just there to add dramatic effect.

0 TrackBacks

Listed below are links to blogs that reference this entry: Drilling HS forward spar and F810.

TrackBack URL for this entry: http://carringtonw4.net/cgi-bin/mt/mt-tb.cgi/446

Leave a comment

About this Entry

This page contains a single entry by Levrie published on July 23, 2009 3:47 PM.

Weldment WD-821-L was the previous entry in this blog.

F810c (bottom views) is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Powered by Movable Type 4.1