Fuselage: Rear parcel area

| | Comments (0) | TrackBacks (0)
68-DSC00033.JPG
71-DSC00035.JPG
I experimented with the rear parcel area to determine whether the extra work would justify using countersunk screws. In my opinion it does!! I will machine countersink the holes and dimple the floor skins to accept counter sunk screws in all visible areas of the floor.

I used a nut plate held in position with a screw, cleco clamped one side of the nut plate whilst drilling the  first 3/32 hole then using a cleco to lock the nut plate in position while drilling the other side

0 TrackBacks

Listed below are links to blogs that reference this entry: Fuselage: Rear parcel area.

TrackBack URL for this entry: http://rv-8a.com/cgi-bin/mt/mt-tb.cgi/294

Leave a comment

About this Entry

This page contains a single entry by Levrie published on October 13, 2008 3:48 PM.

Flap Motor installation was the previous entry in this blog.

1st UK RV-8A flight of G-RVCH is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Powered by Movable Type 4.1