October 2008 Archives

Fuselage: Rear parcel area

| | Comments (0) | TrackBacks (0)
68-DSC00033.JPG
71-DSC00035.JPG
I experimented with the rear parcel area to determine whether the extra work would justify using countersunk screws. In my opinion it does!! I will machine countersink the holes and dimple the floor skins to accept counter sunk screws in all visible areas of the floor.

I used a nut plate held in position with a screw, cleco clamped one side of the nut plate whilst drilling the  first 3/32 hole then using a cleco to lock the nut plate in position while drilling the other side

About this Archive

This page is an archive of entries from October 2008 listed from newest to oldest.

September 2008 is the previous archive.

May 2009 is the next archive.

Find recent content on the main index or look in the archives to find all content.

Powered by Movable Type 4.1