L/H Elevator Rib pair 'closure'

| | Comments (0) | TrackBacks (0)

Paris_08FEB07%20060.jpg
This is the stage towards elevator skin closure. I am going to use a 'newer' technique to avoid using pop rivets that are included in later plans than that of my kit. This picture shows a much better alignment than I first acheived. I simple did not like my earlier attempt and ordered replacement parts accordingly.

0 TrackBacks

Listed below are links to blogs that reference this entry: L/H Elevator Rib pair 'closure'.

TrackBack URL for this entry: http://carringtonw4.net/cgi-bin/mt/mt-tb.cgi/213

Leave a comment

About this Entry

This page contains a single entry by Levrie published on January 30, 2007 4:11 PM.

Elevators: L/H side refit. was the previous entry in this blog.

Elevators: L/H side refit inboard is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Powered by Movable Type 4.1