Elevators: L/H side refit.

| | Comments (0) | TrackBacks (0)
Paris_08FEB07 061.jpg





View of replacement outboard elevator rib. Going through the Dril/deburr/dimple stages before eventual priming.


0 TrackBacks

Listed below are links to blogs that reference this entry: Elevators: L/H side refit..

TrackBack URL for this entry: http://rv-8a.com/cgi-bin/mt/mt-tb.cgi/212

Leave a comment

About this Entry

This page contains a single entry by Levrie published on January 30, 2007 4:11 PM.

Vertical Stabilizer Rear Spar/Skin was the previous entry in this blog.

L/H Elevator Rib pair 'closure' is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Powered by Movable Type 4.1